KiwiRail Bridge 7
KiwiRail Bridge 7
Replacement of a timber, twin bridge with a four span steel bridge including: • Bored piles 24m deep 1000mm in diameter • Insitu concrete head stocks • One abutment was pre cast, installed during a weekend block of line and one abutment was poured insitu • The existing bridges were demolished and new Steel Plate Girder (SPG) bridge four spans installed over a 40 hour block of line

about project
intro of project
- Client: KiwiRail Ltd
- Value: $ 30 Million
- Start: 2023
- Sector: Rail, Roads & Bridges
- Location: Christchurch
- Capability: Construction